From the ground to turnkey.
Seven stages of the construction cycle, each executed with our own equipment and systems.
High-rise slabs backed by formwork engineering.
Custom formwork drawings and value engineering, coordinated directly with the site team.
Formwork and shop drawings Material and cycle optimization Verified structural safety Scheduling and supervision

We prepare the ground with heavy equipment.
Clearing, excavation, cuts and compacted fills, urbanization and roadworks with heavy equipment and survey control.
Mass excavation and trenching Cuts, fills and compaction Roads, water mains and urbanization Surveying and grading

Solid foundations for every structure.
Foundations, reinforced-concrete walls and civil works for buildings, industrial plants and mining projects.
Foundations and concrete walls Water mains, drainage and infrastructure Industrial and mining civil works Concrete placement and vibration

Formwork, steel and concrete at height.
Solid, lightened and high-rise slabs; monolithic walls; reinforcing steel; certified scaffolding and shoring.
Slab shoring Wall formwork Reinforcing steel Vertical structure
- 6.00 m
- Double height
- 9.00 m
- Triple height
- 12 m +
- Special projects
- 5.00 m
- Monolithic walls
Reinforcing steel per ACI / RNC-11.

Light envelopes and interiors.
ACM façades, light envelopes and interiors that prepare the building for finishes.
ACM façades Partitions and ceilings Light envelopes Preparation for finishes
Technical direction by Ing. Ángel R. Caraballo (AWCI training).

High-end finishes.
Guest rooms, bathrooms, lobbies and social areas delivered to luxury-hospitality standards.
Typical room and bathrooms Interior social areas Lobbies and corporate interiors Water parks

Complete resorts ready to operate.
Complete resorts —room buildings, social areas, pools and urbanism— delivered ready to operate.
One contract, one responsible party Cost, schedule and quality control Technical supervision at every stage Operational handover and support
